Regional Rollout Capabilities

Inside Edge Southern California Leverages Its Expertise to Manage the Regional Rollout of a Nationwide Retailer

 

Faced with the challenge of managing a regional remodel rollout efficiently amidst the consistent variance in schedules, arrival times, and scopes of work for multiple store locations, a major national retailer sought out Inside Edge Southern California as a reliable partner who could navigate these challenges with finesse.

The key to Inside Edge’s success relied heavily on their understanding of the layout of the region, including the time required for travel across vast distances. This knowledge became the cornerstone of their solution.

Drawing on their project management team, Inside Edge devised a strategy to address the needs of the retailer, ensuring swift communication and adaptability to sudden changes in scope and completion dates, while still completing the number of projects within the given timeline.

 

Map of the Area Covered

Rollout Details

  • Each store’s remodel required the replacement of roughly 250 sf of carpet tile within various locations around the store, including departments and the store entryway. The total area of the rollout amounted to over 8,670 square feet of replaced carpet.

 

  • Inside Edge achieved the seamless replacement of carpet tile across 38 store locations on-time and accurately. The rollout spanned 5,750 square miles across 35 cities, showcasing its extensive geographic reach.

 

  • The IE Team successfully completed all store remodels on time with weeks to spare.

 

Project Pictures